Going Vertical
Ask
Pipeline › Industrial

CrossPoint Phase 2

4811 N. Interstate 35 · Georgetown · Williamson

IndustrialProposed
1.2MSF
TBDdelivery
About the project

Two buildings of about 606,000 SF each: a build-to-suit preleased to Baer Manufacturing and a spec building; construction was set to start March 2026.

Site facts
Flood zone (FEMA)
X · outside the high-risk flood area

At the mapped point, not a survey. Check the official map before relying on it.

The parties
Developer / owner
Jackson-Shaw
Details
Stage
Proposed
Property type
Industrial
Commercial space
1.2M SF
Address
4811 N. Interstate 35
Area
Georgetown, Georgetown, Williamson County
Status history
  1. Proposed · Feb 10, 2026
Sources
  1. Commercial Property Executive · Feb 10, 2026

Public sources only. Figures as reported.