Institutional renovation at 1 Terminal Dr

1 Terminal Dr · Nashville · Davidson

Addition/alterationInstitutionalIssued
$30.0Mdeclared value
Site facts
Flood zone (FEMA)
X · outside the high-risk flood area
Zoning
AR2A

At the mapped point, not a survey. Check the official map before relying on it.

The permit
Permit number
2026017682
Jurisdiction
Metro Nashville
Work
Addition/alteration
Use
Institutional
Status
Issued
Applied
Mar 2, 2026
Issued
Apr 9, 2026
Description
This Is Phase 2 Of The Central Core Renovation Project Consisting Of The Construction Of The New Elevator Tower And Escalators In The Airport'S Central Core Atrium Space And The Removal Of The Limited Temporary Construction That Was A Part Of Phase 1 Required To Maintain Egress And Safety.