Pipeline › Industrial
Burlington Distribution Center at Westpark 360
Westpark 360 (APN 504-28-004C) · Westpark 360 · Buckeye · Maricopa
2.0MSF
2028delivery
About the project
Groundbreaking April 8, 2026 at the Westpark 360 Industrial Park; operations slated for 2028; originally reported by the Arizona Commerce Authority. Point at Maricopa County Assessor parcel 504-28-004C (owner Burlington AZ Distribution LLC, 178.7 acres, $68.5M deed recorded Dec. 2025).
Site facts
- Flood zone (FEMA)
- X · outside the high-risk flood area
At the mapped point, not a survey. Check the official map before relying on it.
The parties
- Developer / owner
- Burlington Stores
Details
- Stage
- Under construction
- Property type
- Industrial
- Delivery
- 2028
- Commercial space
- 2.0M SF
- Address
- Westpark 360 (APN 504-28-004C)
- Area
- Westpark 360, Buckeye, Maricopa County
Status history
- Under construction · Apr 9, 2026