Pipeline › Other
AbbVie Durham Manufacturing Campus
Rigsbee Road, Angier Avenue and Glover Road · Research Triangle Park · Durham
2028delivery
About the project
$1.4B, 185-acre campus near RTP; construction slated to start later in 2026, delivery by end of 2028 per Bisnow. AbbVie Inc. owns 18 Durham County parcels (about 171 acres) along Rigsbee Rd, Angier Ave and Glover Rd, deeded May 29, 2026; point is the 3402 Rigsbee Rd parcel.
Site facts
- Flood zone (FEMA)
- X · outside the high-risk flood area
- Zoning
- IL
At the mapped point, not a survey. Check the official map before relying on it.
The parties
- Developer / owner
- AbbVie
Details
- Stage
- Proposed
- Property type
- Other
- Delivery
- 2028
- Address
- Rigsbee Road, Angier Avenue and Glover Road
- Area
- Research Triangle Park, Durham, Durham County
Status history
- Proposed · Apr 23, 2026