About the project
1,100-acre-plus master plan; RXR broke ground on two industrial buildings in April 2026, expected mid-2027; plan includes housing, a children's hospital, a Wake Tech campus and over 1M SF of retail. Approximate point is a 75.6-acre RXR LEN Apex Owner LLC parcel on Veridea Pkwy per Wake County records.
Site facts
- Flood zone (FEMA)
- X · outside the high-risk flood area
- Zoning
- SD-CZ
At the mapped point, not a survey. Check the official map before relying on it.
The parties
- Developer / owner
- RXR
Details
- Stage
- Under construction
- Property type
- Mixed-use
- Delivery
- Mid-2027 (industrial buildings)
- Address
- Veridea Parkway
- Area
- Apex, Apex, Wake County
Status history
- Under construction · Apr 15, 2026