About the property
About 200,000 sf Miami River complex with a 167-key Dream Hotel, restaurants and event space, developed with MV Real Estate Holdings and Merrimac Ventures; construction financing closed in October 2026 and completion is scheduled for fall 2028.
Site facts
- Flood zone (FEMA)
- AE · in a Special Flood Hazard Area
- Zoning
- D3 · Waterfront Industrial District Zone
At the mapped point, not a survey. Check the official map before relying on it.
Companies
- Driftwood Capital
- Driftwood Capital · developing