About the property
Mercedes-Benz-branded condo tower in Brickell whose construction stalled for more than a year after basement levels were built; a joint venture with Fontainebleau Development may restart work by the end of 2026.
Site facts
- Flood zone (FEMA)
- X · outside the high-risk flood area
- Zoning
- CS · Civic Space Zone
At the mapped point, not a survey. Check the official map before relying on it.
Companies
- JDS Development Group
- JDS Development Group · developing