About the property
60-story tower with 824 residential units; construction began in early 2025 and the structure topped out in March 2026.
Site facts
- Flood zone (FEMA)
- X · outside the high-risk flood area
- Zoning
- T6-80-O · Urban Core Zone
At the mapped point, not a survey. Check the official map before relying on it.
Companies
- Melo Group
- Melo Group · developing